{"license":"Free to use with attribution to Vaada Meter (license terms to be finalised)","methodVersion":"1.0","generatedAt":"2026-10-05T09:25:49.766Z","data":{"id":"bjp-ls-2014-027","text":"Expand and strengthen the National Solar Mission","quote":"Expand and strengthen the national solar mission.","quoteIsExact":true,"quoteLanguage":"en","quoteEnglish":null,"page":34,"sector":"energy","measurability":"directional","importance":"major","deadline":"2019-05-26","deadlineType":"implied","status":"kept","rating":10,"ratingRule":"kept","provisional":false,"confidence":"high","reason":"Installed solar capacity reached about 28.18 GW by March 2019, and the 2015 Budget revised the mission target to 100 GW by 2022 (rooftop shortfall meant that target was reached only in January 2025).","evidence":[{"date":"2019-03-31","sourceType":"other","publisher":"Wikipedia","title":"Solar power in India","url":"https://en.wikipedia.org/wiki/Solar_power_in_India","quote":"India's installed solar capacity reached 28,180.66 MW (March 2019); the third phase was revised to 100GW by 2022 in the 2015 Union budget.","stance":"supports"}],"tags":["solar","renewables"],"sensitive":false,"review":{"state":"ai_draft","draftedBy":"research-agent","draftedAt":"2026-10-04","reviewedBy":null,"approvedBy":null},"manifestoId":"bjp-ls-2014","partyId":"bjp","electionId":"ls-2014"}}