{"license":"Free to use with attribution to Vaada Meter (license terms to be finalised)","methodVersion":"1.0","generatedAt":"2026-10-05T09:25:49.834Z","data":{"id":"bjp-ls-2019-017","text":"Connect every Gram Panchayat with high-speed optical fibre by 2022","quote":"Every Gram Panchayat will be connected with high speed optical fibre network by 2022.","quoteIsExact":true,"quoteLanguage":"en","quoteEnglish":null,"page":22,"sector":"digital-tech","measurability":"measurable","importance":"major","deadline":"2022-12-31","deadlineType":"stated","status":"partial","rating":6,"ratingRule":"partial_75","provisional":false,"confidence":"low","reason":"BharatNet phase 2 connected well over two lakh of about 2.5 lakh panchayats with fibre by 2022-24, but 'service-ready' coverage lagged and the programme was relaunched (recalled, not verified).","evidence":[{"date":null,"sourceType":"other","publisher":"Wikipedia","title":"BharatNet (Wikipedia)","url":"https://en.wikipedia.org/wiki/BharatNet","quote":"minimum of 100 Mbit/s broadband connectivity to all 250,000 gram panchayats in the country","stance":"supports"}],"tags":["bharatnet"],"sensitive":false,"review":{"state":"ai_draft","draftedBy":"research-agent","draftedAt":"2026-10-04","reviewedBy":null,"approvedBy":null},"manifestoId":"bjp-ls-2019","partyId":"bjp","electionId":"ls-2019"}}