{"license":"Free to use with attribution to Vaada Meter (license terms to be finalised)","methodVersion":"1.0","generatedAt":"2026-10-05T09:25:49.834Z","data":{"id":"bjp-ls-2019-018","text":"Achieve 175 GW of renewable energy capacity by 2022","quote":"We have achieved cumulative installed renewable energy capacity of 76.87 GW as on February, 2019 and are on track to achieve our goal of 175 GW by 2022.","quoteIsExact":true,"quoteLanguage":"en","quoteEnglish":null,"page":22,"sector":"energy","measurability":"measurable","importance":"major","deadline":"2022-12-31","deadlineType":"stated","status":"partial","rating":5,"ratingRule":"partial_50","provisional":false,"confidence":"medium","reason":"India reached roughly 120 GW of non-large-hydro renewable capacity by end-2022 (recalled), about two-thirds of 175 GW; the target was later pushed out.","evidence":[{"date":null,"sourceType":"other","publisher":"Wikipedia","title":"Renewable energy in India (Wikipedia)","url":"https://en.wikipedia.org/wiki/Renewable_energy_in_India","quote":"India at COP 26 set target of achieving 500 GW non-fossil fuel target by 2030","stance":"context"}],"tags":["renewables","175gw"],"sensitive":false,"review":{"state":"ai_draft","draftedBy":"research-agent","draftedAt":"2026-10-04","reviewedBy":null,"approvedBy":null},"manifestoId":"bjp-ls-2019","partyId":"bjp","electionId":"ls-2019"}}