{"license":"Free to use with attribution to Vaada Meter (license terms to be finalised)","methodVersion":"1.0","generatedAt":"2026-10-05T09:25:49.915Z","data":{"id":"bjp-ls-2024-016","text":"Reach 15,000 km of access-controlled highways","quote":"We will strengthen the modern road connectivity ecosystem to 15,000 km of access-controlled highways.","quoteIsExact":true,"quoteLanguage":"en","quoteEnglish":null,"page":47,"sector":"infrastructure","measurability":"measurable","importance":"major","deadline":"2029-06-09","deadlineType":"implied","status":"in_progress","rating":null,"ratingRule":"in_progress","provisional":true,"confidence":"low","reason":"No outcome evidence located in this research pass; not assessed (rating left null, excluded from live scores).","evidence":[{"date":"2024-04-14","sourceType":"other","publisher":"Wikipedia","title":"2024 Indian general election (BJP manifesto section)","url":"https://en.wikipedia.org/wiki/2024_Indian_general_election","quote":null,"stance":"context"}],"tags":["highways","expressways"],"sensitive":false,"review":{"state":"ai_draft","draftedBy":"research-agent","draftedAt":"2026-10-04","reviewedBy":null,"approvedBy":null},"manifestoId":"bjp-ls-2024","partyId":"bjp","electionId":"ls-2024"}}