{"license":"Free to use with attribution to Vaada Meter (license terms to be finalised)","methodVersion":"1.0","generatedAt":"2026-10-05T09:25:49.920Z","data":{"id":"bjp-ls-2024-020","text":"Expand Kavach train protection in mission mode","quote":"we will expand the manufacturing, design and installation of Kavach Systems in a mission mode just as we electrified the railway network.","quoteIsExact":true,"quoteLanguage":"en","quoteEnglish":null,"page":45,"sector":"transport","measurability":"directional","importance":"major","deadline":"2029-06-09","deadlineType":"implied","status":"in_progress","rating":5,"ratingRule":"in_progress","provisional":true,"confidence":"low","reason":"Wikipedia reports Kavach installed on 4,001 route km as of 14 Jul 2025, with a plan of 5,000-5,500 km a year from FY2025-26 and the 34,000 km Golden Quadrilateral by 2027-28. More recent figures not retrieved.","evidence":[{"date":"2025-07-14","sourceType":"other","publisher":"Wikipedia","title":"Kavach (train protection system)","url":"https://en.wikipedia.org/wiki/Kavach_(train_protection_system)","quote":"As of 14 July 2025 Kavach installed on 4,001 route km (as summarised).","stance":"supports"}],"tags":["kavach","rail-safety"],"sensitive":false,"review":{"state":"ai_draft","draftedBy":"research-agent","draftedAt":"2026-10-04","reviewedBy":null,"approvedBy":null},"manifestoId":"bjp-ls-2024","partyId":"bjp","electionId":"ls-2024"}}