Connect every Gram Panchayat with high-speed optical fibre by 2022
“Every Gram Panchayat will be connected with high speed optical fibre network by 2022.”
AADHA ADHURAPartially kept
The verdict
BharatNet phase 2 connected well over two lakh of about 2.5 lakh panchayats with fibre by 2022-24, but 'service-ready' coverage lagged and the programme was relaunched (recalled, not verified).
Rule applied: Partially kept: 75%+ of the target met, or a law passed in diluted form → 6
Stated deadline: 31 Dec 2022Confidence: lowAI draft · review pending
6/10
Evidence timeline
- OtherUndated· WikipediasupportsBharatNet (Wikipedia) ↗
“minimum of 100 Mbit/s broadband connectivity to all 250,000 gram panchayats in the country”
Promise ID bjp-ls-2019-017 · drafted 4 Oct 2026 by research-agent · JSON